Client: The Beach Company

Market: Commercial

Capability: Heavy Civil, Site Prep

Contour was contracted to provide the total sitework package for a new 10 acre mixed use development in Forest Acres, SC. This complex project scope included mass excavation, erosion control, demolition, domestic water, gravity sewer, over excavation, retaining walls, curbing, storm drainage and paving. The project consisted of retail space, multi-family residential, pre-cast parking deck and single family town homes. Our teams navigated this complex project with minimal space to facilitate work under multiple construction disciplines.

  • 51,000 cy of cut to fill excavation
  • 3,800’ of gravity sewer
  • 5762’ of domestic water line
  • 6,250’ of storm drainage line
  • Lime stabilization for CIP wall backfill
  • French drain installation beneath the pre-cast parking deck
  • 5,150’ of curb and gutter
  • 12,000 sy of paving
  • 4 MSE walls
aerial view Project-Commercial-Cardinal Crossing-in construction
aerial view of Project-Commercial-Cardinal Crossing in construction
Project-Commercial-Cardinal Crossing-aerial view
aerial view Project-Commercial-Cardinal Crossing-complete
aerial view Project-Commercial-Cardinal Crossing-complete
Project-Commercial-Cardinal Crossing-aerial view
aerial view Project-Commercial-Cardinal Crossing-complete
aerial view Project-Commercial-Cardinal Crossing-complete

Related Projects