Chatham Park Decentralized Water Resource Recovery Facility

Client: Town of Lexington

Market: Commercial

Capability: Heavy Civil, Site Prep

Contour provided the full civil site work package for this new maintenance facility for the town of Lexington. Our scope included 10 acres of clearing and grubbing, erosion and sedimentation controls, mass excavation, disposal of unsuitable materials, fine grading, parking lot construction, installation of stone base, storm drainage, oil and water separator installation, and concrete curbing. A challenging aspect of this project was traversing an active 16” high-pressure natural gas line with the storm drainage line from the parking lot to the sediment basin.

  • 39,152 CY of excavation
  • 218,160 SF of MBC placement
  • 3,308 LF of storm drain installation
Lexington Maintenance Site Prep Project
Lexington Maintenance Site Prep Commercial Project
Cat349e Loading Dirt Onto Komatsu Dump Truck At Lexington Maintenenace Site Prep Heavy Civil Project
Cat Equipment At Lexington Maintenance Site Prep Commercial Project
Contour Crew Member In Action At Lexington Maintenance Site Prep Commercial Project
Lexington Maintenance Site Finish Grading Commercial Project
Lexington Maintenance Site Utility