1 mile roadway, mass grading for a future 1 million SF Industrial facility.
- 96 Acres of disturbed area
- 1,000,000 SF of building pad prep
- 825,000 cut/fill excavation
- 10,599 Tons of MBC placement
- 2 sediment basins
- 12,283 LF of storm drain installation
- 10,766 LF of curb and gutter
- 24,245 SY of heavy-duty asphalt paving
- 2212 LF of guardrail
- 4886 SF of MSE retaining wall