Aerial view of a forested lake with visible dam structure and riprap slope reinforcement along the shoreline.

Client: Breezy Hill Water & Sewer Company, Inc.

Market: Industrial

Capability: Site Prep

Clearwater Lake Dam Repairs

  • Demolition of existing personnel bridge
  • 34,014 SF of articulated block armoring
  • Sediment & erosion control
  • Replace 1 sluice gate
  • Replace 4 flood gates
  • 900 Board Feet of flashboard replacement
Overhead view of a lakebank lined with riprap and a visible dam, adjacent to a newly seeded field and wooded area.
Close-up of concrete dam with metal gate controls and reinforced embankment, showing spillway and surrounding forest.
Side view of dam and spillway where water flows over into a creek, surrounded by dense trees and reflections on the water.
Elevated view of dam outlet and spillway with water release visible and embankment protected by grid-patterned concrete blocks.
Wide-angle aerial image showing lake, dam, spillway, riprap reinforcement, and large re-vegetated area adjacent to the forest.

Related Projects