Construction of a Class Two Landfill on top of an existing closed landfill.
- 7 Acres of clearing & Grubbing
- 7145 LF of matted trapezoidal and V-ditches
- 58,849 CY cut/fill excavation
- Sediment & erosion control
- Sediment basin
- Storm drain installation
- 3378 SY of fabric and stone base roadway construction
- P&P Bonds